Steam Distribution, Deionized Water & Compressed Air Systems
Steam Generation and Distribution
- Cogeneration Heat Recovery Steam Generator (HRSG) capacity: 44,500 lbs per hour steam at 300 Psig
- #1 Boiler: 50,000 lbs per hour steam at 285 Psig
- #2 Boiler: 50,000 lbs per hour steam at 285 Psig
- #3 Boiler: 58,000 lbs per hour steam at 285 Psig
- Steam distribution to campus at 55-65 Psig through a 10" and a 4" piping located in the tunnel systems
- Steam condensate returned to plant via a 4" line
Deionized Water Production and Distribution
- Two DI units installed in Central Utility Plant, capable of producing 100 gallons per minute (each)
- The DI water stored in a 5,000 gallon tank and distributed to campus at 100 psig via a 2" PVC piping located in the tunnel systems
Compressed Air System
- Two air compressors—one in Central Utility Plant and one in Satellite Plant
- Centrifugal air compression generation of 1,000 SCFM air at 100 psig (each)
- Air distribution to the campus via a 4" piping network