California Institute of Technology

Caltech Solar Phase I

Fall 2008


Technical


  • Location—Holliston Parking Structure
  • Capacity—199 KW AC 480 Volts
  • Modules—852 Panels (72 cells per panel)
  • Dimensions—8’ x 4’ x 2’ thick; weight: 25 Kg
  • Output—280 Watts
  • Panel Manufacturer—SunTech STP260-24/Vb
  • Guaranteed Annual Power Production—321,372 KWH

Avoided Emissions


  • CO2—527,050 lbs per year
  • NOx—138 lbs per year
  • Equivalent in autos removed from service—46 cars

Financials


  • Cost of Installation—$1.9 M
  • System Owner—Solar Power Partners (SPP)
  • Engineer/Installer/Operator—EI Solutions
  • Gas Company Rebate—$2.50 per KW installed
  • Federal Tax Credit—30% of total cost less rebates
  • Contract—15 years

Costs


  • Caltech costs—$0.13 per KWH from SPP
  • Rate escalates at—3.9% per year for 15 years