California Institute of Technology

Current Caltech LEED for New Construction (LEED-NC) Projects


Cahill Center for Astronomy and Astrophysics (Cahill)

Status - Completed
LEED points
  • 40 points probable, 45 points possible
  • Gold attainable

Annenberg Center for Information Science and Technology (IST)

Status - Under construction
LEED points
  • 41 points probable, 48 points possible
  • Gold attainable  

 


Schlinger Laboratory for Chemistry and Chemical Engineering (CCE)

Status - Under construction
LEED points
  • 42 points probable, 47 points possible
  • Gold attainable

Linde + Robinson Laboratory for Global Environmental Science (L+R)

Status - Under construction
LEED points
  • 58 points probable, 67 points possible
  • Platinum attainable